Happy Thanksgiving from Bailiff Enterprises! Our office and plant will be closed Thursday, November 26 and Friday, November 27, 2026. We reopen Monday, November 30.

Fittings & Options · PVC & CPVC

Schedule 80 PVC & CPVC Tank Fittings

These are the PVC and CPVC bulkheads, flanges, valves and pipe fittings we install on our plastic storage tanks at our plant in Willis, Texas. They are not sold separately: we install them on the tanks we build, so your tank arrives ready to plumb in.

What we stock: most PVC and CPVC items in sizes ¾″ to 4″. We have quick access to larger sizes of most items, and if Hayward Flow Control or Spears makes the part, we can get it.

Every PVC and CPVC part that carries liquid on our tanks is Schedule 80, the heavy-wall, dark gray grade used in industrial piping, not the thinner white Schedule 40 sold for home plumbing. Schedule 80 has the same outside diameter but a thicker wall, a higher pressure rating, and enough wall to be threaded. Why Schedule 80 matters · CPVC for hotter liquids

Options available in PVC or CPVC

Most of the plumbing options we build can be made in either material. PVC is the standard choice up to 140°F. CPVC has similar chemical resistance but handles liquids up to 210°F, so we use it when a corrosive liquid runs hot. Tell us the chemical and temperature and we will build the whole assembly in the material that fits.

OptionPVCCPVCNotes
Bulkhead fittingsYesYesThreaded or socket; S x S, S x T or T x T.
Self-aligning bulkheads (tank top)YesNoPVC only.
Bulkhead flangesYesYesANSI 150 bolt pattern.
Bolted double flangesYesYesFlange rings inside and outside the tank wall.
True-union ball valves, ball check valves and foot valvesYesYesMatched to the piping material.
Top fill linesYesYesPipe, union, check valve and ball valve all in one material.
Top drain (discharge) linesYesYesSame construction as a fill line, with a foot valve inside the tank.
Siphon tubesYesYesDraw liquid from near the bottom through a fitting higher on the tank.
Double wall fittingsYesYesFittings that pass through both walls of a double wall tank.
U-vents (4″ and smaller)Yes (DWV)YesAlways screened.
Sight gaugesYes—Clear PVC tube so you can see the level.
Reverse float level gaugesYesInner partsThe outer pipe is clear PVC so you can see the indicator; the inner pipe and parts can be HDPE, PVC or CPVC.

Bulkhead fittings

A bulkhead fitting makes a sealed, removable connection through the wall or dome of a plastic tank. We install PVC and CPVC bulkheads in threaded or socket (solvent-weld) styles.

  • Self-aligning bulkheads (PVC only) on the tank dome. The curved seat lets the fitting sit flat and seal on the slope of the top, so a fill line or vent comes out plumb.
  • Bulkhead flanges (PVC and CPVC) where you want a bolted ANSI 150 connection instead of threads.
  • Gaskets matched to your chemical: EPDM, Viton® or Buna-N. Check ratings in our chemical compatibility database.
PVC self-aligning bulkhead fitting for the curved top of a plastic tank
Self-aligning bulkhead for the tank dome.

Spec sheets: PVC bulkhead fittings (PDF) Self-aligning bulkheads (PDF) Bulkhead overview (PDF)

Flanged connections

Gray Schedule 80 PVC flange on a plastic tank sidewall connection
Gray PVC flange on a sidewall connection.
PVC flange installed on the side of a white polyethylene storage tank
Flanged outlet ready for your piping.
Schedule 80 PVC blind flange
PVC blind flange to close off a spare outlet.

Flanged outlets use the ANSI B16.5 Class 150 bolt pattern, so they bolt straight to standard pipe flanges and valves. We supply PVC and CPVC bulkhead flanges, van stone (loose-ring) flanges and bolted double flanges.

Installing a PVC flange

Flange sizeBoltsBolt sizeTorque (ft-lb)
½″ – 1½″4½″-1315–20
2″ – 3″4⅝″-1120–30
4″8⅝″-1120–30
6″ – 8″8¾″-1033–50

Spec sheets: PVC bulkhead flange (PDF) CPVC bulkhead flange (PDF) PVC bolted double flanges (PDF) CPVC bolted double flanges (PDF)

Valves

Schedule 80 PVC true union ball valve
True-union ball valve.
PVC compact ball valve
Compact ball valve.

True-union ball valves are our standard shut-off on tank outlets and fill lines. The two union nuts let you lift the valve out for service or replacement without cutting the pipe. We also install ball check valves (to stop backflow on fill lines), foot valves and compact ball valves, in PVC or CPVC to match the rest of the piping.

Spec sheets: PVC true-union ball valves (PDF) CPVC true-union ball valves (PDF) Tank valves overview (PDF)

Elbows and pipe fittings

Schedule 80 PVC 90 degree elbow, socket x socket
90° elbow, S x S (socket x socket).
Schedule 80 PVC 90 degree elbow, socket x female thread
90° elbow, S x T (socket x thread).
Schedule 80 PVC 90 degree elbow, threaded
90° elbow, T x T (thread x thread).

Most PVC and CPVC elbows, tees, couplings, adapters and valves come in three end combinations. Which one we use depends on what the fitting connects to and whether that joint will ever need to come apart.

EndsWhat it meansWhen it is the right choice
S x S
socket x socket
Both ends are solvent-welded to pipe.Pipe runs that stay put, such as the piping between a bulkhead and a valve or along a fill line. A cemented joint is the strongest and most leak-resistant, and keeps the full pressure rating of the pipe. It cannot be taken apart without cutting, so we pair it with unions or true-union valves where service access is needed.
S x T
socket x thread
One end solvent-welded, one end threaded (NPT).The transition from welded pipe to a threaded part: a threaded bulkhead, valve, gauge, camlock adapter, pump or metal fitting. The pipe side stays cemented and strong, and the threaded part can still be unscrewed.
T x T
thread x thread
Both ends threaded.Short connections between two threaded parts, and joints that need to come apart for service or be assembled where cement cannot be used. Threading removes wall, so a threaded PVC joint is rated at about half the pressure of plain pipe, and only Schedule 80 or heavier should be threaded. We use T x T where pressure is low or the joint must be removable.

We solvent-weld socket joints with primer and heavy-bodied cement. On threaded joints we use a thread sealant rather than PTFE tape, because tape compressed between plastic threads can deform the joint and crack a female fitting.

Top fill lines

Gray Schedule 80 PVC top fill line installed on a plastic storage tank
Schedule 80 PVC top fill line on a tank.
PVC top fill line with true union ball valve and valve support platform on a tank
Fill line with ball valve and support platform.
Drawing of a tank top fill line assembly with self-aligning bulkhead, union, ball check, ball valve and quick disconnect
Fill line assembly.

A top fill line brings the fill connection down the side of the tank to working height while the pipe enters through the top, so there is no fitting through the sidewall. A standard assembly has:

Fill lines are available in PVC, CPVC and other materials on request. More about top fill lines · Top fill line spec sheet (PDF)

Sight gauges

A sight gauge shows the liquid level at a glance. Ours run a clear PVC tube down the outside of the tank, with a PVC ball valve at the top and bottom so the gauge can be isolated or drained. The tube connects through a polypropylene bulkhead or a welded polyethylene coupling and is held by HDPE support arms and pipe hangers.

Sight gauges come in ½″ to 3″ tubing and fittings; other sizes are available. Sight gauge spec sheet (PDF)

Black polyethylene tank with a clear PVC sight gauge and PVC piping
Sight gauge on a black HDPE tank.
Drawing of a tank sight gauge with clear PVC piping, ball valves and support arms
Standard sight gauge.

U-vents

Vents are the one place we do not use Schedule 80. Our U-vents are made from DWV (drain, waste and vent) PVC, which is lightweight and well suited to vents because a vent line carries no pressure. Every U-vent we install is screened. How we size tank vents

Need a tank plumbed for your system?

Tell us the chemical, temperature and connections you need, and we will quote the tank with the fittings installed. Request a quote · dmiller@plasticstoragetanks.com

Flange gasket, bolt and torque data and the thread sealant guidance are from the LASCO Fittings Schedule 80 PVC catalog; the threaded-joint pressure reduction is from the GF Piping Systems PVC Schedule 80 pipe specification (flanges to ANSI B16.5 Class 150; recommended working pressure 150 psi at 73°F). Always follow the manufacturer’s data for the specific fitting.

★ Tank Wizard