Home › Help › Installation Info
Help · Installation InfoInstalling Your Double Wall Tank
Follow these steps to handle, install and fill your tank safely and get the longest service life from it. Improper handling or installation can void your warranty.
Every tank: step by step
- Inspect on arrival. Check the tank and every fitting before you accept the delivery. Note any damage on the driver's bill of lading and the packing list, then contact us right away so we can correct it quickly.
- Unload carefully. How depends on the tank. Smaller tanks may come on a pallet and can be moved with a forklift; guard the tank against the forklift blades. Larger tanks should be lifted by crane or similar equipment using the molded-in lifting and tie-down lugs. Never roll the tank over its fittings or let its weight rest on a fitting, and set it down on a smooth surface free of rocks and sharp objects.
- Prepare the base. Set the tank on a level concrete base that supports it completely. We can supply site-specific foundation and tie-down specifications from a third-party engineer licensed in all 50 states; charges apply for this service.
- Secure the tank. Anchor it against wind, seismic movement and the motion of its contents. Tie-down systems are available.
- Leave room around it. Allow space for fittings, valves and plumbing, and room for routine work and maintenance.
- Connect the fittings and piping. Hand-tighten plastic bulkhead fittings; over-tightening can cause leaks. Support all fittings, valves and piping on their own so a fitting never carries the weight of pipe, and use flexible connections or expansion joints so the tank can expand and contract. Accessories such as immersion heaters must never touch the tank wall.
- Vent the tank. These tanks are for atmospheric pressure only: never pressurize a tank or pull a vacuum on it. ASTM D1998-21 (section 7.4) calls for vents that comply with OSHA 1910.106 normal venting for atmospheric tanks or another accepted standard, or that are at least as large as the filling or withdrawal connection, whichever is larger, and never smaller than 1" nominal inside diameter. We suggest a vent 1" larger than the largest fill or withdrawal connection. Delivery by compressed air (pneumatic truck unloading) needs larger vents.
- Water-test before service. Fill the tank with water and check the tank and every fitting for leaks before you add chemical.
- Stay within the tank's limits. Confirm that your chemical is compatible with the tank, fittings and gaskets (chemical compatibility), and don't exceed the tank's rated temperature or specific gravity. Don't put loads on the top of the tank or on its fittings. Protect it from impact, especially in cold weather. Anyone who must enter a tank needs confined-space precautions.
- Fill level. Listed capacity is calculated to the top of the straight sidewall, but a tank may be filled "brim" full if it is done with care.
Notes for each tank style
Double Wall Vertical
A tank within a tank: the outer tank holds the contents if the inner tank ever leaks.
- The inner and outer tanks are joined at our plant by thermoplastic welding, so the tank ships and installs as one unit.
- Lift only by the OUTER tank's lifting lugs. The inner tank's lugs are normally plugged.
- The leak detector ships separately (so does an ultrasonic level sensor, if ordered). The leak detector needs no setup or calibration: test it by dipping the sensor in water, then install it in the secondary (interstitial) space between the walls.
- A sight glass is never used on a double wall tank. A reverse float level indicator works well because it needs no sidewall penetrations.
Insulated Double Wall
Containment and temperature control in one unit.
- Follow both the Double Wall and the Insulated Single Wall instructions on this page.
- Lift only by the outer tank's lifting lugs, and never drill into or mount anything on the insulated jacket.
- Insulation adds to the outside size: 2" insulation makes the tank about 4" wider and 2" taller, 3" about 6" wider and 3" taller, and 4" about 8" wider and 4" taller.
Keep it in good shape
Inspect the tank at least weekly for leaks around the fittings, check the tie-downs and vents monthly, and give it a full inspection once a year. See Sanitation Info for cleaning and Measurement Info for sizing, strapping charts and level gauges.