Secondary containment for tank batteries, produced water tanks, chemical tanks and elevated tanks at oil and gas sites, under the EPA SPCC rule and the Bureau of Land Management (U.S. Department of the Interior) on federal and Indian leases. Every requirement links to the government source.
Onshore oil production facilities follow 40 CFR 112.9. The main containment points:
The freeboard standard is the same as at other facilities: EPA considers a 25-year, 24-hour storm event the proper amount. (Source: EPA, bulk storage secondary containment FAQ) See our federal secondary containment rules page for the rain calculation and concrete dike requirements.
Oilfield chemical and fuel tanks are often set on stands or skids so they can gravity-feed a pump or truck. The SPCC rule has no separate category for elevated tanks: a raised tank is still a bulk storage container, so it needs the same sized secondary containment as a tank on the ground. (40 CFR 112.8(c)(2); 40 CFR 112.9(c)(2)) EPA’s integrity testing guidance specifically covers elevated and skid-mounted containers, so they must be inspected on the same schedule. (Source: EPA integrity testing fact sheet (PDF))
Practical points from our experience (not a regulation):
On federal and Indian oil and gas leases, the BLM sets surface operating standards through its regulations and permits. Its main guidance document is Surface Operating Standards and Guidelines for Oil and Gas Exploration and Development, known as the Gold Book, published by the Department of the Interior and the Department of Agriculture. (Source: BLM, The Gold Book)
The Gold Book asks that long-term facilities be painted to blend with the surrounding landscape, generally one or two shades darker than the dominant background, and that low-profile tanks be used and ridgelines avoided where practical. (BLM Gold Book, Chapter 5 (PDF)) BLM picks colors from its Standard Environmental Color Chart, which includes shades such as Shale Green, Covert Green, Shadow Gray and Juniper Green. (BLM Standard Environmental Color Chart (IB 2014-051)) Poly tanks are molded in color rather than painted, so ask us about the colors available before you order for a BLM site.
The BLM rules do not name a tank material. Poly tanks are allowed when they are compatible with the fluid, sized and contained as above, and approved in the site’s permit.
| Option | Good fit |
|---|---|
| Double wall poly tank | Chemical injection, methanol, corrosion inhibitor, acid and brine tanks; sites that move; elevated tanks; keeps rain out |
| Steel or poly containment ring or berm | Tank batteries with several tanks |
| Lined earthen dike | Large batteries; must be impervious, not built from topsoil |
| Containment basin or spill pallet | Totes, drums and small chemical tanks |
| Drip pans | Valves, pumps, wellhead equipment; design to keep wildlife out |
Yes. At production facilities, tank batteries and separation and treating installations need containment for the entire capacity of the largest single container plus sufficient freeboard for precipitation, and dike drains must be kept closed and sealed except when draining uncontaminated rainwater. Flow-through process vessels and some produced water containers may use alternate requirements.
An elevated tank is still a bulk storage container, so it needs the same sized containment as a tank on the ground. Because a leak from a raised tank can spray past a low dike, set the tank inside the containment and consider a double wall tank or splash guarding.
The BLM does not ban or require any tank material. On federal oil and gas leases, its Gold Book guidance calls for containment sized for the largest tank plus precipitation, strongly suggests containment for produced water tanks, and asks for netting or covers to keep out wildlife and paint colors that blend with the landscape. Site-specific conditions come from the approved permit.
For tank containment the Gold Book follows the largest-tank-plus-precipitation approach. For reserve pits, the Gold Book calls for at least 2 feet of freeboard.
BLM asks that long-term facilities be painted to blend with the landscape, generally a shade or two darker than the background, using colors from its Standard Environmental Color Chart, such as Shale Green, Covert Green and Juniper Green. The exact color is set in the permit.
Page reviewed November 2026. Regulations change; always check the current official text.